Your crew did a great job and I enjoyed working with them!
— Safety Director

Excalibur Project List

 

Washington State Department of Transportation, Lewis & Clark Bridge, Longview, WA - Supervised, provided engineering for installation of 6 "Sayfglida" HLL systems and 16 "Lad-Saf" vertical ladder systems.

NASA White Sands New Mexico - Designed, installed 24 "Ariana" HLL systems for roof fall protection.

U.S. Bureau of Reclamation, Grand Coulee Dam, WA - Installed 4 "Ariana" HLL systems 675' and 1,105' long for crane rail access.

U.S. Army Corps of Engineers, Chief Joseph Dam, WA - Inspected, re-certified two 1,500 foot "Ariana" HLL systems for crane rail access.

McCord Air Force Base, WA - Designed, installed 6 overhead "Ariana" HHL systems in two C-17 aircraft hangars.

U.S. Courthouse & Federal Office Building, OR - Fabricated, installed 12 anchorage points for temporary horizontal lifelines for new roof systems.

Hospital, Silverdale, WA - Designed, installed fall restraint system on standing seam metal roof.

Oil Tanker Company, OR - Installed 41 "Lad-Saf" vertical lifeline systems on various ladders of six tankers.

Port of Seattle, CTE Terminal Expansion, SEATAC, WA - Designed and provided all materials and installation of 5 horizontal lifelines on roof of SEATAC Airport Center Terminal Expansion. Provided on-site training for personnel in inspection, use and maintenance of systems and PFAS components. 

PacifiCorp, Grace Flowline, Grace, ID - Designed and provided all materials and installated 28 horizontal lifelines on 11,600 foot long 11ft. diameter wood stave flume. Engineered stanchions for mounting system components.

US Navy, Keyport, WA - Designed and installed 3 horizontal lifelines on weapons storage building roofs. Designed / engineered stanchions for mounting to 24 ga. standing seam roofing. Provided on-site training for personnel in inspection, use and maintenance of systems and PFAS components. 

Kaiser Permanente, Washington and Oregon - Designed and installed roof fall protection systems on three facilities in Washington and Oregon.

U.S. Navy ELF Radio Facility, WA - Fabricated, installed 5 custom fall protection systems comprised of structural fiberglass, aluminum and stainless steel shapes.

Conoco Phillips, Ferndale, WA - Designed and installed 23 Evolution HLL systems above pipe racks.

City of Mountlake Terrace, WA - Installed 3 Lad-Saf vertical lifeline systems on water tanks.

Dix Corporation, Madras, OR - Installed 2 Evolution HLL systems on fish ladder system.  

Kaiser Permanente, Portland, OR - Designed and Installed Sayfglida HLL system above Diesel Storage Tank. 

Kaiser Permanente, Portland, OR - Installed 16 Tip-Over Anchor Posts on building roofs. 

McKinley Service and Equipment,Cook Inlet, AK - Installed 3 Evolution HLL systems on Platform Cranes. 

Kaiser Permanente, Portland, OR - Installed 5 Tip-Over Anchor Posts on building roofs.  

Northwest McGrath, Bremerton, WA - Designed and Installed 6 Evolution HLL systems on rooftops, Install 2 Lad-Saf systems. 

McDonald & Wetle, Inc., Portland, OR - Designed and Installed Evolution HLL systems on 2 elementary school roofs.

McDonald & Wetle, Inc., Portland, OR - Designed and Installed Evolution HLL systems on Parkrose High School building roofs.

Portland General Electric – West Linn, OR - Designed and Installed 1 Sayfglida HLL system fish ladder access platform. 

BF Goodrich, Spokane, WA - Designed and Installed 6 Evolution HLL systems on crane platform for edge of pit access.

Rushforth Construction, Tacoma, WA - Designed and Installed 1 Evolution HLL system on Emerald Queen Casino roof.

Georgia Pacific, Wauna Mill, Clatskanie, OR - Consult for installation of D-rings and reversal of Sayfglida HLL system.

Airgas, Seattle, WA - Designed and installed 2 Evolution HLL systems for paint platforms at Boeing Plant.  

Skanska USA, Seattle, WA - Designed and installed Evolution HLL systems for access on fatigue structure for a Boeing 787.

Dix Corporation, John Day Dam, OR - Inspected and re-certified Sayfglida HLL systems on crane rail inside John Day Dam.

Bureau of Reclamation, Grand Coulee Dam, WA - Inspected and re-certified Sayfglida HLL systems on crane rail inside dam.

Conoco Phillips – Ferndale, WA - Inspected and re-certified 23 Evolution HLL systems above pipe racks.

Lease Crutcher Lewis, Monmouth, OR - Design and install Evolution Lifelines on new roof for Western Oregon University.

JR Merit, Grace Flow Line, Grace, ID - Inspected and repaired HLL systems on top of water flow line.

Washington State Ferry System, Seattle, WA - Remove and replace Lad-Saf vertical ladder safety cable at Faunteroy Ferry Terminal.

NMS Lodging, Anchorage, AK - Design and Install Evolution Lifelines on three hotel roofs.

State of Oregon, Salem, OR - Perform annual inspection of Evolution Lifelines on roof of Justice Building.

Portland Water Bureau, Portland, OR - Design and install Evolution Systems for the tops of three water tanks.

Port of Seattle, Seattle, WA - Perform annual inspection of Sayfglida Horizontal Lifeline on roof of Fisherman’s Terminal.

INL Cask Facility, Atomic City, ID - Design and installation of two RoofSafe HLL systems on standing seam roofs, two Crane Rail HLL systems, and two Dome Access HLL systems. 

Nike, Beaverton, OR - Designed and installed four overhead Unirail systems for theater workers. Designed and installed an HLL on the concrete wall for HVAC maintenance.

Cascade Steel Rolling Mills, McMinnville, OR - Designed and installed Sayfglida HLL systems in Baghouses. Designed and installed horizontal lifelines for crane rails in warehouses.

Nichols Bros. Boat Builders, Freeland, WA - Design and installation of HLL systems on three 144-car ferry boats. 

Veterans Memorial Coliseum, Portland, OR - Designed, fabricated and installed 50 roof anchors for façade renovation.

Temco, Tacoma, WA - Design and install two Sayfglida Overhead Horizontal Lifelines over Conveyor Belts. 

Alderwood Middle School, Skanska, Lynnwood, WA - Purchase, design and installation of RoofSafe anchors for fall protection on new school building. 

Greenwood and Clarkmoor Schools, Joint Base Lewis McChord, WA - Purchase, design and installation of RoofSafe anchors for fall protection on new school buildings. 

Hooper Bay School, Hooper Bay, AK - Design and installation of RoofSafe and Uniline HLL for standing seam roofs for interior Alaska roofing.

Grays Harbor PUD, Aberdeen, WA - Design and installation of RoofSafe anchors, UniLine HLL and UniRail systems for five buildings.   

Reed College, Hoffman Construction, Portland, OR - Design and install of eight Uni8 Overhead HLL Fall Protection systems for a theater.

Oregon State University Residence Hall, Dining Hall, Bend, OR - Design and installation of RoofSafe and Uniline Horizontal Lifelines on standing seam roofs.